USC Medical Campus Central Plant Cooling Tower

USC Med Campus 1 evening intro

Location: Los Angeles, CA

Service: Mechanical

Market Segment: Healthcare

Client: University of Southern California

 

Provide and install new Central Cooling Tower Plant at USC Medical Campus including all pumps and filtration. Also installed 800 ft of new underground 20” piping to tie into existing hospital condenser water piping system.

USC Med Campus 2 USC Med Campus 3 teaching area USC Med Campus 4 board room USC Med Campus 5 medical exam room USC Med Campus 6 exterior entry